重点项目

建设明天的项目。

集团的项目组合涵盖能源、农业工业、矿业与物流基础设施。每个项目均标注其真实进展状态。

  • Tanker loading at a fuel depot.
    运营中
    ENERGYMali — West African corridors

    Securing energy supply

    Import and distribution of petroleum products to industrial, mining and professional customers, relying on the corridors connecting Atlantic ports to the domestic market.

    Annual volumes
    450 000 m³
    Storage capacity
    65 000 m³
    Dedicated fleet
    120 citernes
  • Modern poultry building and packing area.
    运营中
    AGROMali

    Integrated poultry chain

    A complete chain linking feed production, farming, packaging and distribution, in order to reduce dependence on imported protein.

    Production capacity
    2 500 000 têtes/an
    Farming sites
    8 fermes
    Direct jobs
    350 postes
  • Inland aquaculture ponds.
    开发中
    AGROMali

    Inland aquaculture development

    Structuring a fish farming chain built on in-house feed production, water quality control and an unbroken cold chain through to point of sale.

    Target capacity
    1 200 tonnes/an
    Commissioning
    T3 2026
    Ponds developed
    32 bassins
  • Haul trucks and hydraulic excavator during loading.
    运营中
    MININGMali — West Africa

    Contract mining operations

    Operating services on mine sites: stripping, extraction, loading, hauling and material management, with dedicated fleet and teams.

    Volumes moved
    18 500 000 m³
    Machines deployed
    85 unités
    Active sites
    4 mines
  • Heavy equipment maintenance workshop.
    开发中
    LOGISTICSWest African corridors

    Scaling heavy logistics capacity

    Extending heavy transport resources and workshop capacity to improve fleet availability and shorten equipment delivery times.

    Technical centers
    3 ateliers
    Convoy capacity
    240 tonnes
    Heavy vehicles
    95 unités
  • Exploration drill rig during a drilling campaign.
    开发中
    MINERALSWest Africa

    Mineral exploration campaigns

    Mapping, geochemical prospecting and drilling work to assess the mineral potential of areas of interest, ahead of any development prospect.

    Active permits
    7 permis
    Metres drilled
    45 000 m
    Target commodities
    Or, Lithium, Bauxite
  • Industrial logistics platform seen from above.
    规划中
    INDUSTRYMali — Special Economic Zone

    Group industrial platform

    A project to pool infrastructure across subsidiaries: storage, workshops, maintenance and a shared logistics platform, to reduce costs and increase resource availability.

    Footprint
    50 hectares
    Investment
    35 Mds FCFA
    Schedule
    2025 — 2027

以上运营指标和项目时间表根据实际工程进展与集团里程碑按季度统筹更新。